Pricing guide, 2026

What to charge, and how to work it out

Most pricing guides are written for the person paying. This one is written for the person doing the work. Build the number properly first, then check it against what the market is actually paying in 2026.

Build the price, do not guess it

Five steps, in this order. Doing them out of order is the single most common reason a busy trade business makes no money.

  1. 1

    Start with the days, not the price

    How many days on site, honestly, including the half day nobody counts for setting up and clearing away. Multiply by your real day rate. If you do not know what that should be, work it out from your target income and expenses rather than from what the last bloke charged.

  2. 2

    Add materials at cost, then mark them up

    You carried the cost, drove to the merchant and warranty the result, so materials carry a markup. Somewhere between 10% and 25% is normal in the trades. Passing them on at cost is not generosity, it is working for nothing on a third of the job.

  3. 3

    Price the paperwork

    Certificates, notifications, test results, photographs and the phone call explaining it all. On a consumer unit swap that is easily an hour and a Part P fee. It is part of the job, so it goes in the price rather than coming out of your evening.

  4. 4

    Add a contingency you never mention

    Ten percent on anything involving an existing building. You will find the surprise. The customer will not accept that the surprise was free, and they should not have to, but you will feel much better having quietly covered it.

  5. 5

    Check it against the market last, not first

    Once you have a number built from your own costs, compare it with the typical figures below. If yours is way over, look at your day count. If yours is way under, and it usually is, put it up.

A worked example: consumer unit swap

Worked pricing example for a consumer unit replacement
Board, RCBOs and SPD at cost£220
Materials markup at 20%£44
One day on site at a £320 day rate£320
Testing, certificate and Part P notification£90
Contingency at 10%£67
Price to quote£741

That lands at the bottom of the typical £750 to £1,200 range, which tells you the build up is sound and there is room in it. Round it to £750 and you are priced honestly with the market.

Now price the same job at £550 because somebody in a Facebook group said that sounds about right. You have covered the board and paid yourself roughly £250 for a day, then carried all the risk if a circuit fails its test. Do that fifty times a year and the gap is close to £10,000 of profit that never existed.

Typical charges in 2026

National figures. London and the South East run 20% to 30% higher, the North East, Wales and Northern Ireland sit below.

Domestic EICR

£150 to £300
Time on the job
2 to 4 hours
What the price covers
Testing every circuit, recording the results and issuing the report. It does not include putting anything right.
Where trades underprice it
Quoting a flat fee regardless of the board. A 4 bed with two consumer units and a garage supply is not the same job as a 1 bed flat, and pricing it the same means the big ones subsidise the small ones.

Commercial EICR

£200 to £500 plus
Time on the job
Half a day upwards
What the price covers
Priced per point rather than per property, typically £15 to £22 an item with a minimum visit charge around £72 to £108.
Where trades underprice it
Agreeing a price before you have counted the points. Ask for a circuit schedule or walk it first, because a small unit and a small factory both sound like one building on the phone.

Landlord gas safety certificate

£60 to £90
Time on the job
30 to 45 minutes
What the price covers
Safety checks on every gas appliance, the flue test and the CP12 record. Nothing else.
Where trades underprice it
Treating it as a standalone visit. On its own the travel eats the fee. Sold with a service at £100 to £150 combined it becomes a proper job, and the landlord prefers one visit anyway.

Annual boiler service

£70 to £120
Time on the job
60 to 90 minutes
What the price covers
Full service, combustion analysis, a handful of consumables and the paperwork.
Where trades underprice it
Pricing it as a loss leader and never converting it. A service is worth having because it finds the £600 repair and the £3,000 swap, so it needs to be booked, recorded and followed up, not just done.

Consumer unit replacement

£750 to £1,200
Time on the job
1 day
What the price covers
A 10 way board with RCBOs and an SPD, full testing, the Electrical Installation Certificate and Part P notification. The whole range runs £450 to £2,500 depending on the board and what you find behind it.
Where trades underprice it
Forgetting that a board swap turns into a fault find the moment a circuit fails its test. Price the board, then say in writing what happens if the existing wiring does not pass.

Full rewire, 3 bed house

£5,500 to £6,500
Time on the job
5 to 10 days
What the price covers
The full range is £4,500 to £8,500 including VAT, or roughly £60 to £95 per square metre. Materials on a standard 3 bed run around £1,050 with white plastic accessories.
Where trades underprice it
Quoting an empty house price for an occupied one. Working around a family living there adds a day or more of protecting, moving and tidying, and it is worth £1,000 on the quote.

Four pricing habits that cost real money

Pricing against the cheapest quote

There is always somebody cheaper and they are usually about to go out of business. Competing with them means inheriting their margin and, eventually, their outcome. Compete on turning up when you said you would, which almost nobody does.

Not charging for the quote you drove to

Two hours of driving and measuring for a job you had a one in three chance of winning is a real cost that has to sit somewhere. It sits in the price of the jobs you do win. Build it in or stop quoting jobs an hour away.

Leaving the scope vague to keep the price low

The cheap quote that says "rewire, £4,800" and nothing else is how disputes start. Write what is in and what is out. It costs ten minutes and it is the difference between a variation and an argument.

Never checking what the job actually made

Most trades price the next job on a feeling about the last one. Track labour and materials against the quote for three months and you will find at least one job type you have been losing money on for years.

Common questions

How do I work out what to charge for a job?
Build it up rather than guessing. Days on site multiplied by your day rate, plus materials at cost with a 10% to 25% markup, plus time for certificates and notifications, plus around 10% contingency on anything involving an existing building. Only then compare it with typical market prices. Starting from the market price and working backwards is how trades end up with a full diary and no money.
What should I charge for an EICR in 2026?
Domestic EICRs typically run £150 to £300 depending on property size and circuit count, with the national average around £200. Commercial work is priced per point, usually £15 to £22 an item with a minimum visit charge of roughly £72 to £108. London sits 20% to 30% above the national figures.
How much should I charge for a landlord gas safety certificate?
A CP12 on its own runs £60 to £90. Sold together with an annual service the combined job typically lands at £100 to £150, which is the better way to sell it since the travel and setup are the same either way.
Should I charge a day rate or price the job?
Price the job on anything you are quick at, because the speed is yours to keep. Use a day rate for reactive work, fault finding and anything where the scope genuinely cannot be pinned down. The mistake is day rating work you could have priced, which caps your earnings at exactly your day rate no matter how good you get.
How much markup should I put on materials?
Between 10% and 25% is normal across the UK trades. You are being paid for the cash you fronted, the trip to the merchant, the storage and the fact you carry the warranty if it fails. Passing materials on at cost means a large chunk of the job earns you nothing.
Should I show a breakdown on my quote?
Show the scope in detail and be careful about showing a full cost breakdown. Customers rarely argue with a clear description of what is included, but they will absolutely argue with a materials line they have just priced up online. Itemise what you are doing, not what you paid.

Sources

Figures compiled July 2026 and quoted excluding VAT unless stated. Prices in this trade move, so treat them as a benchmark rather than a rate card.

Find out which jobs actually made money

Traddie tracks labour and materials against every quote, so at the end of the month you can see the job types worth chasing and the ones quietly costing you.